Tender detail
Construction of the Orlik sports complex in Rozwadza
Summary
The tender covers the design and construction of the Orlik sports complex in Rozwadza under a design-and-build arrangement. The works include an artificial-turf football pitch with fencing, goals, ball-stop netting and lighting; a polyurethane-surface multi-purpose pitch with volleyball and basketball markings, lighting and drainage; a sanitary and changing-room building with utilities; external works, small architectural elements, demolition works, equipment and obtaining the occupancy permit or the required completion notice. The bidder must demonstrate the required previous experience and personnel qualifications. The tender must be submitted electronically in Polish by 7 September 2026 at 08:00. Price accounts for 60% of the evaluation and the warranty and defects-liability period for 40%; the offered warranty and defects-liability period must be between 36 and 60 months. The works must be completed by 31 August 2027, while the design documentation and required permits must be completed by 14 December 2026. No tender guarantee is required, but performance security equal to 5% of the gross tender price is required.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.