Tender detail
Extension of the geothermal district heating network and connections in the Gare area, Ris-Orangis
Summary
SEER is procuring the extension of its geothermal district heating network in Ris-Orangis to connect the Léon Blum, Place de la Gare and Avenue de la Gare residences and the shallow-geothermal plant. The works comprise a firm tranche of three sections totalling 624 metres and two optional sections totalling 291 metres, for a potential total of 915 metres, including civil works and the supply and installation of the hydraulic, thermal, electrical and communications systems. The contract also includes, as needed, unit-priced treatment and disposal of HAP-contaminated bitumen, asbestos-containing bitumen and polluted soil, under a single-supplier framework agreement capped at €80,000 excluding VAT over a maximum two-year term.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.