Tender detail
Project design and stream channelling works in Ubrique
Summary
The Municipality of Ubrique is procuring, as one mixed contract without lots, the design and safety-and-health studies, construction, works supervision, and health-and-safety coordination for stream channelling and drainage improvements in Los Olivares, Mirasierra and La Ladera, La Calzada, and the Coto Mulera development. The works include concrete channels, drop structures and silt traps, reinforced-concrete conduits, and cross-drainage works, including drainage from the CA-8105 road. The project-design phase is due within two months and the works are scheduled for up to 24 months. The total budget is €1,749,000 including VAT.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.