Supply and installation of replacement beach walkways in Motril
Summary
The Municipality of Motril is procuring the supply and installation of beach access infrastructure to restore pedestrian mobility after storm damage. The contract covers 20 concrete walkways for machinery and 32 reinforced, pile-supported timber walkways, together with the necessary ground levelling and preparation. The works are to be completed on the beaches of Motril, including Playa Granada, within three months; the contract is not divided into lots. The budget is €47,364.96 excluding VAT (€57,311.60 including VAT).