Tender detail

Design and construction works to restore and strengthen Montserrat’s drinking-water supply

Summary

The Ajuntament de Montserrat is procuring the construction design and works to restore and improve the resilience of its drinking-water supply infrastructure damaged by the October 2024 flooding. The single, undivided contract covers enlargement of the Les Crestes reservoir and renewal of its pumping equipment, a pipeline from the Cañades wells to the Ortiz reservoir, associated controls and connections, and testing and commissioning. The estimated base budget is €4,833,606.05 excluding VAT (€5,848,663.32 including VAT); the design period is up to two months and the works period up to ten months, with completion required by 31 December 2027.

Reference number
12000/2026
Buyer
Pleno del Ayuntamiento de Montserrat
Country
Spain (ESP)
Procedure
Open procedure
CPV
45232150 Works related to water-distribution pipelines
Deadline
2026-11-23
Status
Open
Contract subject
Works
Estimated value
5 848 663,32 EUR
Source
ESP_PLACSP

More tender information after sign-in

The public view shows key tender details. Sign in to open official links, documents and AI tender support.