Tender detail
Sarral main wastewater sewer collector renovation works
Summary
This tender concerns the renovation of the main wastewater sewer collector along the Vallverd river in the urban area of Sarral. The works include replacing part of the collector and upgrading the connection network, with a new network consisting of reinforced polyester (PRFV) and cast-iron pipes of various diameters; the existing asbestos-cement network will be removed. The project will be carried out by a single contractor and will not be divided into lots. It is funded by PUOSC; the base contract price is 427,399.09 EUR excluding VAT (517,152.90 EUR including VAT). Proposals are to be submitted electronically; the deadline is 20 calendar days; the maximum execution period is two months. The award criteria include price (70 points) and other automatic criteria: work program (up to 10 points), management-systems certifications (up to 9 points: ISO 9001:2015, ISO 14001:2015, ISO 45001:2018), warranty extension (up to 6 points) and 24/7 incident service (5 points). The abnormal low-price provisions and evaluation rules follow LCSP requirements.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.