Tender detail
Temporary construction power for the Bielefeld special education school centre
Summary
The LWL is procuring temporary construction-site power and lighting for the replacement buildings of the Albatros and Opticus schools at the Bielefeld special education school centre. The works include a 400 kVA generator and a rented 630 kVA transformer, site power distribution boards, cables, cable bridges, and indoor and outdoor lighting, including safety lighting. The installation is to be maintained, inspected during the construction period and removed when no longer needed; the project schedule indicates a construction period of about 33 months. The contract is not divided into lots.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.