Tender detail
Phase 2 – Power and low-voltage systems
Summary
Burghof-Klinik GmbH is procuring electrical and communications-system works for the second construction phase at its Rinteln site, covering the north wing of the hospital. The works include power distribution and wiring, emergency and general lighting, KNX-controlled sun protection, earthing and surge protection, a Hospicall P7 patient call system, fire detection, and passive LAN and WLAN infrastructure. The procurement is for a single phase of the project, not divided into lots.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.