Tender detail
B44 Dornheim Bypass: DN1300 Pipeline Protection Works at Two Crossings
Summary
Hessenwasser GmbH & Co. KG is procuring construction works to reroute the Ried pipeline at two locations affected by the B44 Dornheim bypass. The northern section includes an approximately 72 m accessible trough structure and about 131 m of pipeline; the southern section includes an approximately 66 m trough structure and about 192 m of pipeline. The works also include abutments at both crossing points.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.