Tender detail
Stainless steel swimming pools
Summary
The City of Stuttgart is procuring the construction of stainless-steel swimming pools for the new Zuffenhausen indoor swimming pool. The work includes a multi-purpose pool measuring approximately 25 × 12.5 m, with a water depth of 1.25–3.85 m, and a variable-depth pool of the same dimensions, with a water depth of 0.30–2.70 m and a partially movable floor. The pools are to be built in accordance with DIN 19643.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.