Tender detail
Phase 1 – Connecting the Burg industrial and commercial park to the regional road network
Summary
The tender covers the first construction stage of connecting the Burg industrial and commercial park to the regional road network. The works include clearing approximately 26,200 m² of construction site, milling around 2,000 m² of asphalt, removing about 9,300 m³ of soil and rock, and preparing approximately 14,000 m² of road formation. They also include placing around 4,250 m³ of frost-protection layer, approximately 11,750 m² of crushed-stone road base, and about 11,000 m² of asphalt layers. The contractor must construct an infiltration ditch or swale approximately 2,400 m long, carry out road and other marking works, and fell around 100 trees. Further works include seeding approximately 3,200 m² of grass, constructing a culvert about 22 m long, carrying out replacement and compensation measures, installing approximately 1,500 m of drinking-water pipeline with W2 proof, and constructing around 1,500 m of electrical cable trench. The machine-readable notice does not specify precise participation, qualification or compliance requirements; these must be checked in the official tender documents. The bid deadline is 15 October 2026.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.