VE05_2 route from the Primstal storage reservoir to the filtration building
Summary
Gemeindewasserwerke Nonnweiler is procuring construction works for a new drinking-water transmission main between the Primstal storage reservoir and the filtration building. The works include approximately 1,800 m of DN 250–DN 300 ductile-iron water main, sewer renewal and rehabilitation including approximately 540 m of trenchless lining, around 1,900 m of microduct bundles for future fibre-optic installation, and protective ducts for the energy network, including around 1,500 m of DN 110 ducts. Associated excavation, trench support, dewatering, testing, connections and surface reinstatement are also included.