Tender detail

VE05_2 route from the Primstal storage reservoir to the filtration building

Summary

Gemeindewasserwerke Nonnweiler is procuring construction works for a new drinking-water transmission main between the Primstal storage reservoir and the filtration building. The works include approximately 1,800 m of DN 250–DN 300 ductile-iron water main, sewer renewal and rehabilitation including approximately 540 m of trenchless lining, around 1,900 m of microduct bundles for future fibre-optic installation, and protective ducts for the energy network, including around 1,500 m of DN 110 ducts. Associated excavation, trench support, dewatering, testing, connections and surface reinstatement are also included.

Reference number
4b80b4b4-8e28-41c6-88d4-9a9c2278327f
Buyer
Gemeindewasserwerke Nonnweiler
Country
Germany (DEU)
Procedure
Open procedure
CPV
45221250 Underground work other than tunnels, shafts and subways
Deadline
2026-12-14
Status
Open
Contract subject
Works
Estimated value
Not published
Source
DEU_BKMS

More tender information after sign-in

The public view shows key tender details. Sign in to open official links, documents and AI tender support.