Tender detail
Replacement construction of the K5 bridge over the Ellebener Bach
Summary
The Ilm-Kreis district administration is procuring replacement construction of the bridge on district road K5 over the Ellebener Bach. The works include removing about 200 m² of asphalt surfacing and 100 m of kerbs and drainage channel, installing about 200 m² of asphalt and base course, constructing 180 m of reinforced and 140 m of unreinforced bored concrete piles, and building 70 m³ of reinforced concrete substructure and 54 m³ of reinforced concrete superstructure and cap. The bridge and wing walls will also receive about 50 m of steel railing. The contract is not divided into lots, and works are to be completed by 31 December 2027.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.