Tender detail
Pletterstraße wastewater facility – construction of a connecting ditch
Summary
The City of Bocholt is procuring civil engineering works to connect a former wastewater discharge point to the existing stormwater retention basin at Pletterstraße by means of an approximately 226 m ditch, with a sealed ditch bottom and a maintenance path. The works include approximately 3,500 m² of earthworks, 1,100 m² of gravel base, 1,000 m² of gravel turf, 1,860 m² of geosynthetic clay liner, and approximately 11 m of DN 700 reinforced-concrete stormwater sewer, together with drainage, pumping, roadworks and related site works. The procurement is not divided into lots.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.