Tender detail
Replacement of electrical and control cabinets for the secondary clarifier scraper bridges at Dresden-Kaditz wastewater treatment plant
Summary
Stadtentwässerung Dresden GmbH is procuring, in a single lot, the staged renewal of electrical, instrumentation and control equipment for six identical secondary clarifier scraper bridges at the Dresden-Kaditz wastewater treatment plant. The work includes new control cabinets with PLC hardware and software, rewiring drives and replacing and rewiring sensors, as well as dismantling, execution and workshop planning, commissioning and trial operation. The scheduled performance period is 8 February to 1 October 2027.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.