Tender detail
Replacement of the K5 bridge over the Ellebener Bach
Summary
The Ilm-Kreis District Office is procuring replacement construction of the K5 bridge over the Ellebener Bach. The works include removing about 200 m² of asphalt and 100 m of kerbs and gutters; installing about 200 m² of asphalt; constructing 180 m of reinforced and 140 m of unreinforced bored concrete piles, 70 m³ of reinforced concrete substructure and 54 m³ of reinforced concrete superstructure and bridge deck edge; and installing 50 m of steel bridge and wing-wall railings. The contract is not divided into lots.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.