Tender detail
Wastewater pressure pipeline from Güstrow to Parum treatment plant, construction phase 3 “Industrial Area”
Summary
Barlachstadt Güstrow is procuring construction works for the third phase of the wastewater pressure pipeline from Güstrow to the Parum wastewater treatment plant. The four-lot procurement includes, among the documented work, approximately 340 m of DN 500 ductile-iron pressure pipeline installed by open trench, associated earthworks and groundwater management, and surface reinstatement. The documented surface works cover the industrial-area section up to station 0+138 and include road and footway reconstruction, drainage connections, lighting, markings and landscaping.