Tender detail
CHP Plant Engine Replacement
Summary
Stadtwerke Bitterfeld-Wolfen GmbH is procuring the replacement and installation of a combined heat and power (CHP) plant at its Reudener Straße site in Bitterfeld-Wolfen. The plant is to have an electrical output of 1.1 MW and use an air-cooled synchronous generator with a rated voltage of 6.3 kV. The single-lot contract includes the plant components, detailed engineering, installation, commissioning and final acceptance, as well as a maintenance agreement for the plant’s operating life. The stated implementation period is 2 March to 22 December 2027.