Tender detail
Renewal of the Heating System and Instrumentation, Control and Regulation Technology at Bettendorf Wastewater Treatment Plant
Summary
Wasserverband Eifel-Rur is procuring the renewal of the heating system and measurement, control and regulation technology at the Bettendorf wastewater treatment plant. The works cover the combined heat and power plant, a 310 kW dual-fuel boiler and the heat distribution system, including the heating circuits and their controls. The contract is divided into specialist lots, and the works are intended to improve the use of the plant’s digester gas for heat and power.