Tender detail
New sidewalk along S 184 Frauensteiner Straße in Weißenborn and connection to Dorfstraße
Summary
The Municipality of Weißenborn is procuring construction of a sidewalk along S 184 Frauensteiner Straße and a sidewalk connection to Dorfstraße, in one contract lot. The works include 560 m² of concrete-paved sidewalk, 172 m² of asphalt sidewalk, kerbs, lighting masts, cable-protection ducts and retaining elements, as well as general site and traffic-safety works. Construction is scheduled from 5 April to 20 August 2027.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.