Cycle path connection between the North Bridge/B215 and Klein Hutberger Weg – Phase 1
Summary
The City of Verden is procuring first-phase earthworks for a cycle-path connection between the North Bridge on federal road B215 and Klein Hutberger Weg. The work includes removing about 750 m³ of topsoil, supplying and placing approximately 2,500 m³ of sand to form an embankment, preparing a 40 cm frost-resistant layer for the future path, and restoring slopes and verges with topsoil, grass seeding and erosion-control matting. The paved cycle path itself is planned for a later phase and is not included.