Tender detail
Reconstruction of the Wolfsgrube/Wasserturm bus stops in Dreißigacker, Meiningen
Summary
The City of Meiningen is procuring accessibility improvements to the Wolfsgrube/Wasserturm bus stops in the Dreißigacker district. Works at the two stops include excavation, replacement and frost-protection materials, drainage and cable trenches, asphalt and concrete paving, kerbs, tactile ground indicators, and a bus shelter with its foundation. The works are scheduled from 1 March to 2 July 2027; they are not divided into lots.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.