Tender detail
Renewal of the Southern Melle Ring Water Main
Summary
The Waterworks of the City of Melle is procuring construction works to renew the southern Melle ring water main in sections V, VI and VIII of the first construction phase and section IV of the second phase. The works include removing and replacing drinking-water pipes, installing sections by open-cut and horizontal directional drilling, connecting the new pipes to the existing network, and restoring affected roads and paving. The scope also includes a pressure-reducing and metering station and associated valves, hydrants and fittings.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.