Tender detail
Final construction of the road in the Salinger Feld industrial area
Summary
The City of Witten is procuring the final construction of the road in the Salinger Feld industrial area. The existing 660-metre construction road, 5.5–8.2 metres wide, will be removed and replaced with a 7-metre-wide asphalt carriageway. Footpaths with parking facilities will be built on both sides, averaging approximately 2.0–2.5 metres in width, and tree planting areas will be added along the road. The procurement is not divided into lots.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.