Tender detail
Repair of Holzhafen Bascule Bridge 2
Summary
The procurement covers the repair of the protected Holzhafen Bascule Bridge 2, including preparation of supplementary execution documents related to damage identified through inspection and measurement. The bridge superstructure is to be dismantled, and the bridge structure, reinforced-concrete substructures, control house and electrical distribution house are to be repaired. The existing drive is to be removed, reconstructed and reinstalled; the existing pile foundation will remain in place for reuse. The repaired bridge is intended for pedestrians and cyclists.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.