Tender detail
Restoring ecological continuity at Wipper Mill, Osmarsleben
Summary
The works will restore ecological continuity at Wipper Mill on the Wipper in Osmarsleben. They include removing two bed drops and forming a natural riverbed, constructing a cofferdam, demolishing and disposing of 130 tonnes of concrete, excavating and disposing of 1,420 tonnes of soil and stone, and stripping, storing and reinstating 1,200 m² of topsoil. The works also include installing 470 m² of filter-separation layer and 584 m² of stone pitching, filling 365 m² of spaces between stones with gravel, constructing 46 m² of stone set paving, carrying out a site survey, and planting six replacement trees with one year of establishment care and three years of maintenance.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.