Hanke detail
La Fàbrica kultuurikeskuse lõunafassaadi akende ja avatäidete vahetamine Celràs
Kokkuvõte
Celrà Municipality is procuring works to replace the existing windows and other façade joinery on the south façade of the cultural centre’s bar building at La Fàbrica. The works cover four assemblies across 32.39 m² and are intended to improve the façade’s airtightness, insulation and energy efficiency. The contract is not divided into lots and has a duration of 90 days.
Rohkem hankeinfot sisselogimisel
Avalik vaade näitab hanke põhiandmeid. Logi sisse, et avada ametlikud lingid, dokumendid ja AI hankeabi.